Projects / Healthcare

Pietersburg Hospital

Clinical interiors at Pietersburg Hospital. LEMEG’s record at the hospital includes its Hybrid Cardiothoracic Theatre.

Hybrid operating theatre with a ceiling-mounted imaging arm, monitors and an operating table.
Fig. 01

LEMEG’s record at Pietersburg Hospital includes the Hybrid Cardiothoracic Theatre, completed 2009 to 2010 for the Limpopo Provincial Department of Health. LEMEG recorded it as the first provincial hospital to have a hybrid cardiothoracic theatre. The theatre allows a conventional surgical procedure and a catheter-based interventional procedure, guided by fluoroscopy imaging, to be combined in a single procedure under one anaesthetic.

Pre-contract: project inception and appraisal; concept and design development; technical and procurement documentation. Post-contract: construction-phase contract administration, technical inspections and quality control.